DSİ — Güleker Construction — Line Stopping and Horizontal Drilling Projects

Line Stopping Structures, Horizontal Drilling Pipe, Penstock, Branch Connections, DN1400 Butterfly Valve
2,400 tons
2017-2019

Reis Energy — Çekerek Regulator and HPP

Yozgat, Türkiye
Gates and trash racks
128 units4 m
2019-2022

Güleker Construction — Davutpaşa Regulator and HPP

Türkiye
Radial gate, cofferdam gate, gate lifting device, platforms and guardrails
52 units6-8 m
2017

Güleker Construction — Misis Irrigation

Adana, Türkiye
Pump station gates and mechanical works
224 units1-2 m
2010-2013

Mehmet Güneş Construction — DSİ — Menzelet Irrigation Project

Kahramanmaraş, Türkiye
Radial gates, slide gates, automatic siphon structures, pump station penstock
58 units4-6 m
2014-2015

Bukor Energy — Bukor 2 HPP

Bilecik, Türkiye
Regulator gates, gravel flushing gates, service gates, hydraulic and mechanical lifting equipment
32 units7-9 m
2012-2014

NVS Construction — Pirinçlik HPP

Karabük, Türkiye
Gates, trash racks, penstock, hydraulic lifting assemblies
28 sets of lifting assemblies6-8 m
2022-2024

Fernas Construction — Davutlar Regulator

Hatay, Türkiye
Gates
26 units6-8 m
2020-2022

Fernas Construction — Şirvan HPP

Siirt, Türkiye
Gates, penstock, valve equipment
18 units6-10 m
2015-2016

Eren Energy — ZETES 3 Cooling Water Line

Zonguldak, Türkiye
Large-diameter steel pipeline, expansion bellows, steel structures
38 expansion bellowsØ3700
2014-2015

NVS Construction — DSİ — İmamoğlu Irrigation, Part 1

Adana, Türkiye
Penstock, AVIS gates
24 units4-7 m
2015

Ahmetli HPP Electricity Generation — Ahmetli HPP

Adana, Türkiye
Spillway radial gates, gravel flushing gates, intake gates, penstock, hydraulic lifting equipment
16 units6-8 m
2016

Güleker Construction — İmamoğlu Irrigation, Part 2

Adana, Türkiye
Gates and penstock
28 units3-4 m
2011-2013

Bereket Energy — Göktaş 1-2 HPP

Adana, Türkiye
Penstock, draft tube pit liner, slide gates, hydraulic gate lifting assemblies
10 sets of lifting assemblies6-8 m
2015

Bukor Energy — Tüfekçikonağı HPP

İnegöl, Türkiye
Regulator gates, intake gate works, penstock, mechanical lifting equipment
18 units2-5 m
2015

Akpınar Electricity Generation — Akpınar Regulator and HPP

Kahramanmaraş, Türkiye
Regulator gates, intake gates, loading dock gates, penstock, hydraulic lifting equipment
12 units2-8 m

Enerjisa Üretim — Doğançay Regulator and HPP

Adana, Türkiye
Underwater structure gates, trash racks, gravel gate covers
8 units4-8 m
2011

Bereket Energy — Toros HPP

Adana, Türkiye
Gates and trash racks
12 units3-4 m
2014

Bukor Energy — Akdere HPP

İnegöl, Türkiye
Regulator gates, gravel flushing gates, penstock, hydraulic and mechanical lifting equipment
12 units3-4 m
2022

Kızılev Aydındere Energy — Kızılev HPP

Giresun, Türkiye
Gates and penstock
12 units3-4 m
2023

Akkord STİK — Azerbaijan gate works

Azerbaijan
AVIS gates, repair gates
34 units
2017-2018

NVS Construction — Konya Plain Irrigation Project

Konya, Türkiye
Gates, trash racks, butterfly valves (DN1400-DN1800), penstock
32 gates, 26 valves
2011-2012

Güfen Energy — Gökboyun HPP

Osmaniye, Türkiye
Regulator gates, gravel flushing gates, service gates, penstock, hydraulic lifting equipment, draft tube
9 units3-4 m
2017

ICC Holding — DSİ — Büyükkumla Dam

Bursa, Türkiye
Gates
8 units3-4 m
2017

Reis Energy — Dereköy HPP

Antalya, Türkiye
Expansion bellows
3 pcsØ2200
2012

NVS Construction — Sekiyaka HPP

Antalya, Türkiye
Penstock
2014

NVS Construction — DSİ — Musabeyli Dam

Yozgat, Türkiye
Penstock
2015

NVS Construction — Morgedik Dam

Van, Türkiye
Penstock
2013

Enerjisa Üretim — Yamanlı HPP

Adana, Türkiye
Penstock, steel bridge
2019

Ünal Construction — Kars Dam

Kars, Türkiye
Penstock, valve and equipment installation
2022

Dakook Construction — Habbaniyah-Ramadi Dam

Iraq
Regulator gates
2017-2018

Reis Energy — Çayaltı HPP

Zonguldak, Türkiye
General hydromechanical maintenance works
2022-2024

Özka Construction — Kovanlık HPP

Giresun, Türkiye
Penstock
2020-2021

Gülsan Holding — Derya 2 Regulator and HPP

Türkiye
Tunnel pipeline